CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Providing Business Continuity Plan after Natural Disasters: A Case Study in the Staff Area of Water and Wastewater Company of Tehran

عنوان مقاله: Providing Business Continuity Plan after Natural Disasters: A Case Study in the Staff Area of Water and Wastewater Company of Tehran
شناسه ملی مقاله: JR_JDER-2-2_005
منتشر شده در شماره 2 دوره 2 فصل در سال 1398
مشخصات نویسندگان مقاله:

Vahid Shafaie - Department of Natural Disaster Management, Graduate Faculty of Environment, University of Tehran, Tehran, Iran- Department of Natural Disaster Management, University of Applied Science and Technology of Red Crescent, Qazvin, Iran
Farid Darvish - Department of Natural Disaster Management, Graduate Faculty of Environment, University of Tehran, Tehran, Iran
Mehrdad Nazariha - Department of Natural Disaster Management, Graduate Faculty of Environment, University of Tehran, Tehran, Iran
Saeed Givehchi - Department of Natural Disaster Management, Graduate Faculty of Environment, University of Tehran, Tehran, Iran

خلاصه مقاله:
Introduction: Each economic and non-economic institute is inevitably forced to pay special attention to the post-crisis phase to keep its organizational alive, carry out its missions, and reduce the damages and costs caused by various crises. In this research, we tried to extract the Business Continuity Plan (BCP) after the natural disaster of earthquake in the staff area of Water and Wastewater Company of Tehran within the localized framework of BS-25999 British Standards Institution (BSI). Methods: In this regard, a questionnaire was used for data collection. Analysis of the questionnaire results was performed by SPSS19 and Expertchoice11 applications. Results: The manager of Water and Wastewater Company of Tehran was found to be the best authority for managing the emergency so that the company can continue its operation and return to normal situation. According to the findings, the hot site was selected as the best location for business continuity of Water and Wastewater Company of Tehran, which could be an alternative site to continue the activities and services after the disaster. Conclusion: A localized post-earthquake Business Continuity Plan (BCP) was suggested in the staff area of Water and Wastewater Company of Tehran. In this site, necessary actions can be perfromed to continue the activities before, during, and after the disaster. Furthermore, organizational chart and task description can be redefined in it.

کلمات کلیدی:
Standard BS-25999, Business Continuity Plan (BCP), staff area of Water and Wastewater Company of Tehran

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/1004898/