Particle swarm optimization for multi resource constrained project scheduling problem with varying resource levels and weighted earliness tardiness

عنوان مقاله: Particle swarm optimization for multi resource constrained project scheduling problem with varying resource levels and weighted earliness tardiness
شناسه ملی مقاله: MNGC05_026
منتشر شده در پنجمین همایش ملی مدیریت حسابداری و مهندسی صنایع در سال 1401
مشخصات نویسندگان مقاله:

F Golmohammadi - Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
S.M.T Fatemi Ghomi - Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran

خلاصه مقاله:
This paper deals with particle swarm optimization for multi resource constrained project scheduling problem with varying resource levels (MRCPSPVRL) and it incorporated applies weighted earliness tardiness in the problem. In a project scheduling problem, there are many activities with successor, predecessor relations, also they have certain durations and resource requests. In realistic project scheduling problems, different types of resources are used to implement the task. MRCPSPVRL uses various types of resources by changing resource levels in a predetermined manner. Maximum time necessary for completing the task in MRCPSPVRL is divided into different time periods, which resources are varied within these different time periods. The main objective of Project Scheduling Problem is to find an optimum time schedule by considering all constraints. The problem is tested using particle swarm optimization on MATLAB R۲۰۲۰b. this paper extends the work done by Jiby Joy, Srijith Rajeev, Eldhose C, Abraham [۱].

کلمات کلیدی:
Particle swarm optimisation, Resource constrained project scheduling, Varying resource levels, Weighted earliness tardiness