CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Modeling a novel resource-constrained project scheduling problem

عنوان مقاله: Modeling a novel resource-constrained project scheduling problem
شناسه ملی مقاله: ICMI02_186
منتشر شده در دومین کنفرانس بین المللی مدیریت و مهندسی صنایع در سال 1394
مشخصات نویسندگان مقاله:

B Shah-Hoseini - Department of Industrial Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran
S.M.T Fatemi Ghomi - Full professor, Faculty of Industrial Engineering & Management Systems, Amirkabir University of Technology-Tehran Polytechnic, Tehran, Iran
M Karimi-Nasab - Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
Moeen Sammak Jalali - PhD Candidate, Faculty of Industrial Engineering & Management Systems, Amirkabir University of Technology-Tehran Polytechnic, Tehran, Iran

خلاصه مقاله:
This paper provides mathematical analysis for a resource-constrained project scheduling problem in two folds: mathematical formulation, and algorithm development. Correspondingly, the problem has some special assumptions such as (i) resources need a lag time after each use in order to have recovery/service, (ii) each activity can be compressed, and (iii) project available budget is limited. This problem is rarely analyzed in the literature especially for the case of dedicated resources, while we develop a special-purpose algorithm that defeats general-purpose solver Lingo 11.0 on different test problems. The proposed algorithm uses problem characteristics in the form of guiding rules efficiently. At the end, computational experiences are reported.

کلمات کلیدی:
Project scheduling; Resource-constrained; Activity compressibility; Budget

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/513348/