Crashing Project Time and Project Cost Optimization using Linear Programming Approach: Case Study

سال انتشار: 1401
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 173

فایل این مقاله در 7 صفحه با فرمت PDF و WORD قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

MNGC05_024

تاریخ نمایه سازی: 29 شهریور 1401

چکیده مقاله:

Most construction projects are not delivered on time. In some projects, the project master wants to complete the project at the specific time that is less than the normal project completion time. Obviously, it is better to reduce the project time with lowest cost. For this paper the data is collected about a canal construction project from the project supervisor. The linear programming model is applied to find crash time for each activity. Then the model is solved by Excel software, and results are obtained for each activity. Finally, the optimal cost related to the requested crash time was determined.

کلیدواژه ها:

Project scheduling- Linear programming- Trade-off analysis- Crashing.

نویسندگان

S Sarlak

Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran

S.M.T Fatemi Ghomi

Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran