Simultaneous Scheduling of Energy & Spinning Reserve Considering Customer and Supplier Choice on Reliability
محل انتشار: نوزدهمین کنفرانس مهندسی برق ایران
سال انتشار: 1390
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 935
فایل این مقاله در 6 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICEE19_016
تاریخ نمایه سازی: 14 مرداد 1391
چکیده مقاله:
In this paper, a new model is proposed for simultaneous clearing of energy and reserve market considering generation deficiencies and transmission constraints where the reserve capacity is scheduled based on the desired risk level of customers and suppliers, that is recognized by the expected load not supplied (ELNS) index and expected power not served (EPNS) criterion. Also, the required reserve allocated to generators is calculated separately, i.e., part of reserve is allocated to generation deficiencies and the rest of it is considered for transmission restrictions. Therefore, this method produces market-clearing results with the desired probabilistic characteristics. For illustrating the efficiency of proposed technique, it is applied to the Roy Billinton test system (RBTS) and results are analyzed
نویسندگان
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :