Design of Stilling Basin with Stepped End Sill
محل انتشار: نهمین کنگره بین الملی مهندسی عمران
سال انتشار: 1391
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,688
فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICCE09_847
تاریخ نمایه سازی: 7 مهر 1391
چکیده مقاله:
Stilling basins are frequently used to dissipate excess flow energy at downstream of hydraulic structures such as spillways which may otherwise cause excess scouring in the river bed and hence may lead to failure of the hydraulic structure itself. Thus, design of stilling basin is an important technical and economical activity. In the design of stilling basin, length and geometry is very important as it affects the formation of hydraulic jump, and hence the energy dissipation. In this study, the impact of end sill in thestilling basin is studied through the model study of Siahbisheh Dam spillway in Iran. A stepped spillway with 1.5 m width and a stilling basin at the downstream of the stepped chute were constructed to evaluate stilling basin performance. Four stepped end sills were tested at three different locations of 2.3, 2.4, and 2.8 m from the beginning of the stilling basin. Various flow characteristics were studied for three different discharges. Five different cross sections were considered in the stilling basin to investigate forced hydraulic jump properties. Hydraulic characteristics of forced hydraulic jump by various aspects of stepped end sill have been compared with classical hydraulic jump characteristics. Further, the best design combination has been suggested on the basis of hydraulic characteristics of the jump under variable conditions
کلیدواژه ها:
نویسندگان
M Abdolahpour
Hydraulic Structures Division, Water Research Institute WRI, Tehran, Iran
R Roshan
Hydraulic Structures Division, Water Research Institute (WRI), Tehran, Iran