Impossibility of Performance of Contract in the United Nations Convention on Contracts for the International Sale of Goods
سال انتشار: 1394
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 62
فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_UPAEI-4-3_002
تاریخ نمایه سازی: 13 شهریور 1402
چکیده مقاله:
The Impossibility of performance of the contract as an exemption from liability, arising from the breach of contract, is an issue which is discussed in the sale contracts. International Sale of Goods which is enacted in ۱۹۸۰, discusses the matter in its Article ۷۹. The CISG abstains to use such terms as Frustration and Force majeure which are used in national legal systems. This prevention of using such terms thought to be the way that CISG keeps itself independence from national legal systems. As a result the CISG ordains its specific terms and conditions to set up the exemption for damages arising from the breach of contract by the person who has faced impediments and breached the contract. This research studies different aspects of the impossibility of performance of contract in The Convention on the International Sale of Goods, therefore not only it presents the concept and bases of occurrence of the Force majeure, it discusses applicable examples such as sanctions and changes in regulations as Force majeure.
کلیدواژه ها:
نویسندگان
Hamid Reza Salehi
Department of Law, Payame Noor University, Tehran, Iran
Narges Baqeri-Motlaq
Ph.D Candidate at Faculty of Law, Shahid Beheshti University, Tehran, Iran
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :