Adoption of an Appropriate Excavation Method in construction process Case Study: Sabzkuh Tunnel, Iran
سال انتشار: 1392
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,090
فایل این مقاله در 13 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICCAU01_2922
تاریخ نمایه سازی: 29 تیر 1393
چکیده مقاله:
Tunnel face stability is one of the main issues in tunnel excavation in soft and alluvial grounds in order to keep the construction process stable and prevent localized face collapse. Choosing of an appropriate excavation method is influenced by geological and geotechnical studies and comprehensive and appropriate use of these data in tunnel designing. An advance length of 1.5 meter without any support system caused many difficulties at the excavation of sabzkuh tunnel. So for overcoming to the complicated ground conditions in addition to the decreasing of the excavation step, the excavation method were changed from full face to sequential excavation.This paper discusses some of the key geotechnical challenges faced in the tunnel design, including characterization of ground conditions, selection of appropriate design parameters, and evaluation of excavation and support installation sequence based on monitoring and analyzing ground behavior during construction.
کلیدواژه ها:
نویسندگان
m taromi
Civil Engineer, IAU, Tehran South Branch, Tehran, Iran.
a eftekhari
M.sc of Geology, University of Tarbiat Modares, Tehran, Iran.
m saeidi
M.sc of Rock mechanics, University of Tehran, Tehran, Iran.
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :