Scheduling Linear Deteriorating Jobs in a Two Machine Flowshop to Minimize the Number of Tardy Jobs
محل انتشار: دومین کنفرانس بین المللی مهندسی صنایع و مدیریت
سال انتشار: 1395
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 904
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
INDUSTRIAL01_377
تاریخ نمایه سازی: 21 شهریور 1395
چکیده مقاله:
In many real production situations, jobs take longer times if the start later. This phenomenon is known as deteriorating jobs. This paper investigates two machine flowshop deteriorating jobs scheduling problem where its objective is to minimize the number of tardy jobs. The actual processing time of a job is an increasing function of its execution start time. The problem is known to be NP-hard; therefore, a branch and bound algorithm incorporating with several dominance rules and lower bounds is proposed to derive the optimal for thr problem. The computational experiments indicate that the branch and bound algorithm can solve most of the medium jobsize problems within reasonable time.
کلیدواژه ها:
نویسندگان
Abbas-Ali Jafari
Department of Industrial Engineering, Faculty of Engineering, Yazd University, Yazd, Iran
Hassan Khademi Zare
Department of Industrial Engineering, Faculty of Engineering, Yazd University, Yazd, Iran
M.M Lotfi
Department of Industrial Engineering, Faculty of Engineering, Yazd University, Yazd, Iran
Reza Tavakkoli-Moghaddam
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :